RISK ASSESSMENT FOR PREPARING SHISHA PIPES FOR SMOKEING.
Workplace:
-
Area to have sink close by with cold water.
-
Non flammable work surface, for example, stainless or ceramic preparation area.
-
Glass base bowl breaking (by dropping)
-
Clay bowl breaking (while placing on the shisha pipe)
-
Shisha Lite (Charcoal) falling onto body or floor area once lit.
-
Germs spreading via the mouth tip.
Persons Exposed:
-
Shisha Pipe employees setting up the shisha pipe
-
Customers in 1 meter radius of the working shisha pipe
-
Customers within 10 meters from passive smoking.
Existing Control Measures:
-
Employ professional person to set up and distribute the shisha pipes
-
Provide stainless tongs to handle the shisha lite charcoal.
-
Provide mouth tips or foil for each person smoking the shisha pipe
Level of Risk:
m
Smoke in lungs (High risk of lung cancer)
m
People close by inhaling the smoke (Passive Smoking)
m
Further Control Measures/Actions Required:
-
Customer smoking the shisha pipe does not move the location of the shisha pipe
-
Customer is aware that smoking can damage your health
-
Customers allow the shisha pipe server to reposition the shisha lite charcoal
-
Tray provided with the shisha pipe to catch charcoal.
-
Tin foil used around the clay bowl to protect shisha lite from falling.
-
Wind cover to be used to stop falling charcoal or skin exposed to charcoal.
Assessment made by:
Paul Maxwell-King
|
Night Club / College Date 2010 |
|
Assessor :
Date of
review :
Paul Maxwell-King
2010
|
|
1.
Activity or environment to be assessed :
Shisha Pipe Venue
|
|
2.
Hazards identified :
(indicate each as slightly harmful, harmful or extremely harmful)
Burns – Slightly Harmful.
Glass Breakage – Slightly Harmful,
Smoke inhalation – Extremely Harmful |
|
3. Person exposed to the risk :
Client, Assistant and people in a 1 meter range of the shisha pipe.
|
|
4. Specific factors affecting the risk :
Dancing near the shisha pipe
Moving the shisha pipe to a different location
Unstable positioning of the Shisha Pipe.
|
|
5. Control measures in place at the time of assessment :
Site supervision, Personal Protective Equipment including wind cover
|
|
6. Risk evaluation :
(Use risk matrix to choose from trivial, tolerable, moderate substantial or intolerable)
Burns – Minimal
General Client Hazards – Tolerable
Smoke inhalation - Tolerable
OVERALL RISK EVALUATION :
Low / Medium
|
|
7. Further action necessary to control the risks identified :
Stone or tiled floor – Special Shisha Pipe smoking area – Herbal Molasses
|
|
8. Persons responsible for implementing control measures :
The venue owner and the shisha pipe representative.
|
|
9. Schedule for improvement :
No longer than 3 days |
|
10. Comment :
Overall risk to clients and operatives – minimal.
|